
Mark the route
From the meter or source to the house, walked and marked with you before anything is dug.
AI visualizationPlan the route, trench and line, with responsibility for each connection confirmed during the site visit. Free estimates.
AI visualization
AI visualizationThenewspotneedswaterandthereisnolinetoityet.Theoldlinerunsunderwhereanewdrivewayorpatioisgoing.Theroutebetweenthesourceandthehousehasnotyetbeenmarked.Responsibilityfortrenching,lineplacementandeachconnectionhasnotbeendefinedyet.
A water-line hookup includes a route, trench, line and connection points. The estimate should state which party handles each part.
Scroll the list. The pin shows where each piece lives.

From the meter or source to the house, walked and marked with you before anything is dug.

Utility-marking requirements and the proposed route are reviewed before digging.

Cut along the marked route, between the source and the house.

The water line goes in the trench, run to each connection point.

The scope states who handles the meter or source connection and the house connection.

The trench is filled back in and the surface is graded to match the yard.




Not included: Interior plumbing beyond the point of connection, Work the utility company performs on its own equipment, Permits, where they are required.
Not sure which of these the spot needs? That is what the visit is for.
Get a free estimateRoute first. Trench second. Connections last, by whoever owns each one.

Where the water needs to start and where it needs to end up.




Marked route, narrow trench, continuous potable-water line, connection and restored grade.
AI visualization
AI visualization
AI visualization
AI visualizationThe estimate reflects route length, existing conditions, access, crossings, connection responsibilities and restoration needs observed during the site visit.
What sets the number
Responsibility for the route, trench, line and each connection should be clear before work begins.
AI visualizationTalk through the project. Start with the visit.
Get a free estimateHow the visit, estimate and site work are organized.
Gregorio walks the route with you, looks at the meter or source, the house, and what is between them, and writes down the scope.
Written, for that route. The trench, the line and each connection, with who handles what spelled out.
Utility-marking requirements are addressed first. Then the trench and line proceed, followed by the scoped connection work, backfill and grading.
Questions about your property? Bring them to the estimate visit.
From the meter or the source to the house, along the route marked on the visit.
Tell us where the project is and what you want to change. Gregorio walks it with you, then writes down the scope and the estimate for it.
Call (678) 353-6280